Jracking Warehouse Racks Shelves Heavy Duty Cantilever Racking System for Warehouse Pipe Storage

Product Description

Cantilever Racking Banner
Cantilever Racking Overview
Product Specifications
Name Cantilever Racking Material Q235B Steel
Size Customized Size Color Customized Color
Depth Customized Weight Capacity 1000kg/arm
Width Customized Height Customized
Finish Powder coating; Hot Dip Galvanized
Packing Export Package
Certification RMI / CE / ISO / TUV / AS4084-2012
MOQ One 20ft/40ft Container
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Product Gallery & Details
Racking Detail 1
Racking Detail 2
Racking Detail 3
Racking Detail 4
Installation & Assembly Guide
Installation Step 1
Step 1

Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.

Installation Step 2
Step 2

Position the column (1) vertically into the fixing MK base, as shown. Connect the column and the base with M20x40 bolts (7). Fastening the other M20x40 bolts (7) on the base. Recommended torque: 86~103N.M.

Installation Step 3
Step 3

The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.

Installation Step 4
Step 4

The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20x40 bolts(7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10x160 anchors(11). Firmly bolt the fastening plate in place. Recommended torque: 50 N.m.

Installation Step 5
Step 5

The arm (12) is fastened to the column (1) using safety pins Ø29x140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.

Installation Step 6
Step 6

Finally, the completed structure should look like the illustration.

Applications & Factory Display
Showcase 1
Showcase 2
Showcase 3
Showcase 4
Showcase 5
Showcase 6
Showcase 7
Showcase 8
Showcase 9
Product Range Categories
Frequently Asked Questions (FAQ)
Q: What's your trading terms?
  • Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
  • Lead time: Normally in 20-25 days after deposit received.
  • Sample policy: Samples are always available for each model. Samples can be ready in 7-15 days once payment received.
  • Shipping port: Shanghai / Nanjing, China.
  • Discounts: We offer good discounts for large quantities.
Q: How can I deliver my goods?
  • Sea freight: We will update sea freight once we know your sea port where goods will be delivered.
  • Agent designated by client: Please tell us the contact details of your shipping agent and we will arrange delivery.
Q: What is your service?
  • Your inquiry related to our products or prices will be replied within 12 hours.
  • Well-trained and experienced staff to answer all your inquiries in fluent English.
  • OEM & ODM service; any customized racking can be designed per requirement.
  • Experienced professional engineers to provide optimal storage solutions.
Q: What is the process to purchase your product?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
Q: What's your key advantage?
  • Payment: Flexible terms including O/A 40-60 days.
  • Lead time: Fast delivery capability for rush orders.
  • Factory price: Factory direct sales offering competitive pricing.
  • Warranty: Two years warranty, broken parts will be replaced and dispatched to you.
Q: Does Jracking have an MOQ limitation or tooling fee policy?

MOQ: No strict MOQ, but higher quantities offer better pricing. We recommend an order quantity for regular products fitting at least one 20ft container (approx. 15 tons).

Tooling Fee: For necessary custom tooling, Jracking charges the cost prior to opening new molds for the first order. The cost will be partially or fully refunded after reaching specified order volumes.

Related Products